Skip to content
Remodeling Premium Service Delivery

Whole Home Renovation

Whole Home Renovation

We plan scope and sequencing so your renovation feels intentional from room to room, with consistent finishes and clean transitions.

Serving Oregon & Washington. Licensed, insured, and detail-driven from first call to final walkthrough.

Scope

What’s Typically Included

Clear scope reduces surprises. These are the most common items we plan for and build.

  • Phasing plan (what happens first, what can overlap, what must wait)
  • Consistent finish direction (floors, trim, paint, hardware)
  • Kitchen/bath coordination where included
  • Lighting plan across the home
  • Door, casing, and transition details
  • Systems coordination (electrical/plumbing/HVAC as needed)
  • Protection and dust control planning
  • Punch list and final walk-through

Decisions

Popular Choices

Helpful decision categories homeowners usually choose between. No brand lock-in.

  • Phasing: room-by-room vs. concentrated phases (kitchen first, then baths)
  • Flooring: refinish vs. replace vs. continuous new flooring
  • Openings: keep walls vs. open up key connections
  • Lighting: refresh fixtures vs. add recessed + layered plan
  • Trim level: simple modern vs. classic profiles
  • Finish consistency: match existing vs. update across the home

Planning

Timeline & Cost Drivers

Practical guidance to help you plan. We’ll confirm specifics after a site visit and scope review.

Typical Timeline

8–20+ weeks (typical), depending on scope and phasing

Every project is different. Here are the most common factors that affect schedule:

  • Phasing complexity and whether the home is occupied during work
  • Permitting and inspections (if structural/systems change)
  • Material lead times (flooring, windows/doors, custom items)
  • Discovery in older homes (framing, electrical, plumbing)
  • Number of rooms and trades involved

Cost Guidance

Whole home renovation cost is driven by scope breadth, finish level, systems work, and how much changes structurally. We’ll confirm pricing after defining phases and selections.

What affects cost:

  • Amount of structural change (walls, openings, layout changes)
  • Flooring scope across the home
  • Kitchen/bath scope included in the renovation
  • Electrical/plumbing/HVAC upgrades
  • Window/door replacement vs. refresh
  • Finish level and consistency across all spaces

Gallery

Inspiration & Finish Direction

A few references to align on the look and feel before we lock scope.

Open-plan living room renovation with cohesive finishes
Open-plan living room renovation with cohesive finishes
Living room with modern layout and finishes
Living room with modern layout and finishes
Elegant living space with refined renovation details
Elegant living space with refined renovation details
Fireplace lounge detail with modern interior finishes
Fireplace lounge detail with modern interior finishes
Bright living room styling inspiration
Bright living room styling inspiration
Lifestyle detail for a calm, cohesive home feel
Lifestyle detail for a calm, cohesive home feel

Process

How We Deliver It

A calm build comes from good sequencing and clear communication.

  1. Step 1

    Define priorities + phases

    We align what matters most and build a plan for sequencing so the renovation stays manageable.

  2. Step 2

    System + finish alignment

    We coordinate systems and finish direction so transitions feel intentional across the home.

  3. Step 3

    Build in phases

    We execute the plan with clear communication, protection, and trade coordination.

  4. Step 4

    Detail + handoff

    We handle punch list and final details so the home reads as complete.

FAQ

Questions We Hear Often

Can we live in the home during a whole-home renovation? +

Sometimes. It depends on scope and phasing. We’ll outline what’s realistic and help you plan around key disruptions.

How do you keep finishes consistent? +

We define a finish direction early and document key selections so each phase matches the overall plan.

Do you handle permits and inspections? +

When required, we’ll clarify what permits are needed and sequence work around inspections.

How do you keep the project from feeling endless? +

Phasing and decision timing matter. We’ll prioritize high-impact areas, lock selections early, and keep work sequenced so you see progress.

Can we combine a renovation with an addition? +

Often yes. We’ll discuss feasibility and sequencing so new work integrates cleanly with the existing home.

Quick scope call

Ready to talk through your project?

Call for a quick scope conversation. We'll confirm next steps and give you a clear path forward.

Serving Oregon & Washington. Phone: (503) 470-7007

Call Now Email Us

We’ll respond as quickly as possible during business hours.